[Nohara Industrial Co., Ltd. Authorized Dealer] Field Ridge Leakage Prevention Construction 'Moran Method (R)'
[Nigata Prefecture Agency] Standard construction distance of 100-150m/day! Due to the impact method using a breaker, it can handle hard ground!
The "Moran Method (R)" creates a waterproof barrier made of bentonite, which has a strong water-stopping effect within the levee, restoring and enhancing the water retention function of leaking levees. The waterproofing material takes effect immediately after application. It is highly flexible and can penetrate complex gaps, maintaining its waterproofing function over the long term. Additionally, it constructs an effective waterproof barrier in a pinpoint manner, minimizing the impact area of the construction. This method is trademarked and patented by Nobara Kogyo Co., Ltd., and Advance Co., Ltd. is the official distributor for the company in Niigata Prefecture. 【Features】 ■ Environmental Adaptability - The waterproofing material is made from naturally derived inorganic minerals, so it does not degrade. - It complies with soil environmental standards and the standards of the Japanese Pharmacopoeia. ■ Quick Construction - Standard construction distance is 100 to 150 meters per day, allowing for rapid installation and minimizing impact on farming. *For more details, please refer to the related links or feel free to contact us.
- Company:アドヴァンス
- Price:Other